Skip to main content
MY Cali Builders Inc

ADU in Westlake Village

Accessory dwelling unit planning and build work for homeowners adding flexible living space. Serving Westlake Village and the San Fernando Valley.

Westlake Village

ADU contractor in Westlake Village

On a larger property the unit is rarely the only thing being drawn, and deciding early how it relates to the house, the yard and whatever else is planned saves redrawing later. The accessory dwelling unit still runs its own four stages. Drawings, engineering and the submittal set are brought together first, as one coordinated package. Ground-up construction moves through excavation, footings, framing, roof and weather envelope. Utility tie-ins run a water supply, a waste line and an electrical feed with dwelling capacity out to the unit. Interior finish work covers cabinetry, worktops, flooring, tile, doors and paint, and the final walkthrough closes a written punch list in front of you.

Contact is (310) 220-0903, by call or by text, and the visit that follows is an Onsite Visit + Free Estimate carrying a detailed scope of work and a remodeling consultation. Both are free. Where a unit is one piece of a bigger plan, the scope sets out the order the pieces happen in, which matters because groundwork done once for several elements is a different proposition from groundwork repeated three times. That sequencing decision belongs at the start. No price for this service is published on the site, and none is quoted before the property has been seen. Permit work, preparation through to filing, is carried by the builder. Financing is available. The completed unit carries a warranty of 5 years, under licence CSLB #1072368, held by a licensed and insured contractor in business since 2020.

Westlake Village area

First Neighborhood, North Ranch and Westlake Island are the neighborhood names here. A second dwelling has to find room on the lot before anything else is settled, so where the house already stands, and what else the owner wants built around it, shapes the footprint more than the address ever will.

Neighborhoods served: First Neighborhood, North Ranch, Westlake Island.

Near: Westlake Lake, Lindero Canyon Road, the 101.

What is included

  • Detached and attached ADU builds
  • Plan coordination and permit support
  • Ground-up construction and utility tie-ins
  • Interior finish work and final walkthrough

Service overview

How we handle ADU

Other areas

ADU in nearby cities

Free estimate

Get a quote for ADU in Westlake Village

We come to your property, assess the project, and provide a written estimate. Free, no obligation.

Call usMessage Us

Materials and financing

Recent work

ADU projects near Westlake Village

3 projects

Public reviews

Reviews from real homeowners

Real feedback from Google and Yelp. Every review links to the original profile so you can verify it yourself.

I recently hired My Cali Builders for a backyard remodel and couldn't be happier. Danny and his team were professional, punctual, and easy to communicate with. They really paid attention to the details and brought my vision to life. The quality of the work exceeded my expectations from start to finish. Everything was done cleanly and on schedule, which I really appreciated. Danny made the whole process smooth and stress-free. The backyard now looks amazing and feels like a completely new space. I would definitely recommend them to anyone looking for reliable contractors.

Roy R

Roy R

04/06/2026 06:36:04

Google review
View on Google

Honest and straight to the point. Won't waste your time. Quick to resolve any issue you may have.

Joseph Creedon

Joseph Creedon

02/25/2026 01:14:13

Google review
View on Google

Was very impressed! Prompt. Highly professional. Thorough. Excellent feedback and service while response completing my job. I absolutely would hire them again and recommend them without any concerns!

melissa dlin

melissa dlin

02/02/2026 21:53:54

Google review
View on Google

I began my Yelp search for a company to perform structural repairs and ultimately chose 5 companies, scheduling each of them for a representative to visit and discuss my needs. I chose My Cali Builders based upon Danny's (owner) review of the work and how he defined the scope of the work. The other representatives vacillated on the scope of the work and attached various caveats. My Cali Builders also gave me the best bid. So I hired them and boy, am I glad I did. Work was performed quickly, efficiently and the finish work was excellent. Every task I initially discussed with Danny was completed. Danny's crew including Francisco and Jaime, were top notch and pleasant. Each day, refuse and trash were removed. Every day, Danny either visited or texted to advise on progress and to insure the work was progressing as discussed and to ask if I was satisfied and happy. I can't convey in words how much I appreciated My Cali Builders. Look no further, they are the best I've ever encountered.

Y

Yelp reviewer

Feb 1, 2026

Yelp review
View on Yelp

Danny and crew were amazing! Can't say enough about their ability to stay on budget and perfect timing. PROs all around

Sheri Sadler Wolf

Sheri Sadler Wolf

02/01/2026 17:22:07

Google review
View on Google

Danny Raz is a man of action; the work was done promptly and even finished ahead of schedule. The workers were polite, respectful, of cleaned up well after the job.

James Mathers

James Mathers

02/01/2026 16:17:02

Google review
View on Google

FAQs

ADU in Westlake Village - common questions

Answers to the most common questions about this service in your area.

Financing is available, and nothing beyond that is published here: no rate and no repayment detail. It is a conversation for the onsite visit, particularly where a unit sits inside a larger set of plans, because how a build is funded shapes what gets started first and what waits. Raising it early keeps the phasing and the funding in one discussion rather than two.

ADU builds typically run 3 to 6 months from permit approval through final inspection. We map the milestone schedule before field work starts. We give you a written schedule during the estimate so milestone dates are clear before field work starts.

ADU builds require permits and we handle the full submittal, plan check, and inspection sequence. Permit timelines vary by city and we factor them into the schedule from day one. You can also step back to the main Westlake Village page to compare related local services.

It is not published. Unit size, detached or attached, foundation, the distance services have to be carried and the finish level are the main levers, and where the unit is drawn alongside other work the shared groundwork changes the arithmetic. The free onsite visit and the detailed scope of work it produces are how a number is arrived at for your property.

Yes. CA Contractor License #1072368. Fully insured for liability and workers compensation. The public record is on the CSLB lookup.

Expect a walk of the property rather than a sales presentation. The questions are practical: where could a unit sit, how does it relate to the house and the yard, what size suits, what finish level you have in mind, and what else is planned for the site. Nothing is measured against a template. Afterwards you get a written scope of work and a remodeling consultation, free, and you decide in your own time.

Ready to get started?

Get a free estimate

Free onsite visit. Written estimate. You will see the full scope before you decide. No pressure, no vague quotes.

License #1072368. Fully insured. Serving the San Fernando Valley since 2020.