# How Long Does It Take to Remodel a House in Los Angeles?

Realistic timelines for whole house, kitchen, bathroom, and ADU remodels in Los Angeles. Design, permits, construction, and where projects slip.

May 12, 20266 min readCSLB License #1072368

![how long does it take to remodel a house](https://www.mycalibuilders.com/blog-images/how-long-does-it-take-to-remodel-a-house.jpeg)

Trust and Process project by MY Cali BUILDERS INC

**Short answer.** A whole-house remodel in Los Angeles takes 7 to 12 months from contract to close. A kitchen runs 3 to 5 months. A bathroom runs 3 to 5 months. ADUs run 6 to 12 months. Design and permits often take longer than construction itself.

## Typical timelines by project type

Project type  | Design and permits  | Construction  | Total

Bathroom remodel  | 4 to 8 weeks  | 4 to 7 weeks  | 3 to 5 months
Kitchen remodel  | 4 to 8 weeks  | 6 to 10 weeks  | 3 to 5 months
ADU (detached)  | 10 to 16 weeks  | 16 to 26 weeks  | 6 to 12 months
Garage conversion ADU  | 8 to 12 weeks  | 10 to 16 weeks  | 5 to 7 months
Whole house remodel  | 12 to 20 weeks  | 16 to 28 weeks  | 7 to 12 months
Whole house + addition  | 16 to 28 weeks  | 24 to 40 weeks  | 10 to 17 months

## Where time goes

### Design and selections

Floor plans, elevations, finish selections, fixture selections, lighting design, and structural review. Plan 4 to 16 weeks. Faster when the homeowner is decisive and has reference images ready.

### Permits

LADBS plan check ranges 2 to 16 weeks depending on project complexity. Coastal Commission overlays, HPOZ review, and hillside grading reviews each add 1 to 4 months. Title 24 energy compliance review runs in parallel.

### Material lead time

Cabinets: 6 to 12 weeks. Tile: 2 to 6 weeks. Windows: 6 to 14 weeks. Plumbing fixtures: 2 to 8 weeks. Major appliances: 3 to 12 weeks. Order long-lead items first.

### Construction

Demo through final inspection. Schedule depends on permit type, scope, and trade coordination. A reasonable benchmark is one week per $24,000 to $36,000 of construction cost on residential remodel work.

## Three common reasons projects slip

1. **Late material delivery.** Cabinets and tile arrive late or damaged. Mitigated by ordering early and inspecting on arrival.
2. **Mid-project change orders.** The homeowner changes scope after demo. Each change adds 1 to 3 weeks.
3. **Plan check correction rounds.** Each round adds 1 to 3 weeks. Quality drawings reduce correction rounds.

For project-specific timelines, read [kitchen remodel timeline](https://www.mycalibuilders.com/blog/kitchen-remodel-timeline) and [bathroom remodel timeline](https://www.mycalibuilders.com/blog/bathroom-remodel-timeline). For survival strategies during construction, see [how to survive a home renovation](https://www.mycalibuilders.com/blog/how-to-survive-a-home-renovation).

Free onsite estimate

### Ready to start your ADU project?

We come to you, review the scope, and give you a written estimate before any work starts. No pressure. No vague quotes. CA Contractor License #1072368.

[Call us](tel:+13102200903) [Text Us](sms:+13102200903) [Get a free estimate](https://www.mycalibuilders.com/contact-us)

Project gallery

## Real projects from our crew

Recent work from MY Cali Builders across the San Fernando Valley.

[See full gallery](https://www.mycalibuilders.com/gallery)

![Traditional kitchen with wooden cabinets and tiled countertops.](https://www.mycalibuilders.com/project-media/kitchen-remodeling/WhatsApp%20Image%202026-05-08%20at%2008.35.33%20(4).jpeg)

Kitchen Remodeling

![Modern living space with wood paneling and minimalist furniture.](https://www.mycalibuilders.com/project-media/kitchen-remodeling/WhatsApp%20Image%202026-05-08%20at%2008.35.34%20(1).jpeg)

Kitchen Remodeling

![Contemporary kitchen featuring stainless steel appliances and patterned backsplash.](https://www.mycalibuilders.com/project-media/kitchen-remodeling/WhatsApp%20Image%202026-05-08%20at%2008.35.43%20(1).jpeg)

Kitchen Remodeling

Related services

### See how we approach this work

- [Full Home Remodeling](https://www.mycalibuilders.com/services/full-home-remodeling)
- [Kitchen Remodeling](https://www.mycalibuilders.com/services/kitchen-remodeling)
- [ADU](https://www.mycalibuilders.com/services/adu)
- [Full Home Remodeling in San Fernando Valley](https://www.mycalibuilders.com/service-areas/san-fernando-valley/full-home-remodeling)
- [Full Home Remodeling in Calabasas](https://www.mycalibuilders.com/service-areas/calabasas/full-home-remodeling)

About the author

Written by the MY Cali BUILDERS INC team. Licensed California general contractor, CSLB #1072368. Based in Woodland Hills and serving the San Fernando Valley. [About our team](https://www.mycalibuilders.com/about-us).

FAQs

## Frequently asked questions

Plan 7 to 12 months from signed contract to final inspection. Design and permits: 3 to 5 months. Construction: 4 to 7 months. Whole-house projects with structural changes can run 12 to 18 months.

Plan 3 to 5 months total. Design and permits: 4 to 8 weeks. Construction: 6 to 10 weeks. See the dedicated kitchen remodel timeline post for the week-by-week schedule.

LADBS plan check runs 2 to 8 weeks for typical remodels and 8 to 16 weeks for additions with structural review. Coastal Commission or HPOZ overlays add 2 to 4 months.

Sometimes. Bathroom-only remodels with no permit can wrap in 4 to 6 weeks. Express plan check at LADBS shaves 2 to 3 weeks. Pre-ordered materials and finalized selections shave 3 to 6 weeks.

Three causes account for most slips: late material delivery, mid-project change orders, and plan check correction rounds. All three are largely controllable with disciplined planning.

Keep reading

## More from the blog

[![kitchen remodel timeline](https://www.mycalibuilders.com/blog-images/kitchen-remodel-timeline.jpeg)](https://www.mycalibuilders.com/blog/kitchen-remodel-timeline)

Kitchen Remodeling7 min read

### [Kitchen Remodel Timeline: Week-by-Week Schedule for a Los Angeles Project](https://www.mycalibuilders.com/blog/kitchen-remodel-timeline)

Real week-by-week kitchen remodel timeline for a Los Angeles project. Design, permits, cabinets, demo, rough trades, and finish. What slips and why.

May 12, 2026 [Read article](https://www.mycalibuilders.com/blog/kitchen-remodel-timeline)

[![bathroom remodel timeline](https://www.mycalibuilders.com/blog-images/bathroom-remodel-timeline.jpeg)](https://www.mycalibuilders.com/blog/bathroom-remodel-timeline)

Bathroom Remodeling6 min read

### [Bathroom Remodel Timeline: Week-by-Week Schedule](https://www.mycalibuilders.com/blog/bathroom-remodel-timeline)

Week-by-week bathroom remodel timeline for a Los Angeles project. Design, permits, demo, rough trades, tile, and finish. What slips and why.

May 12, 2026 [Read article](https://www.mycalibuilders.com/blog/bathroom-remodel-timeline)

[![how to survive a home renovation](https://www.mycalibuilders.com/blog-images/how-to-survive-a-home-renovation.jpeg)](https://www.mycalibuilders.com/blog/how-to-survive-a-home-renovation)

Trust and Process7 min read

### [How to Survive a Home Renovation: A Practical Guide for Los Angeles Homeowners](https://www.mycalibuilders.com/blog/how-to-survive-a-home-renovation)

A practical guide for surviving a home renovation in Los Angeles. Living arrangements, pet plans, communication, and stress management during construction.

May 12, 2026 [Read article](https://www.mycalibuilders.com/blog/how-to-survive-a-home-renovation)

[See all articles](https://www.mycalibuilders.com/blog)

Ready to get started?

## Get a free estimate

Free onsite visit. Written estimate. You will see the full scope before you decide. No pressure, no vague quotes.

[Call us](tel:+13102200903) [Text Us](sms:+13102200903) Send us a message

License #1072368. Fully insured. Serving the San Fernando Valley since 2020.