# Bathroom Remodel Timeline: Week-by-Week Schedule

Week-by-week bathroom remodel timeline for a Los Angeles project. Design, permits, demo, rough trades, tile, and finish. What slips and why.

May 12, 20266 min readCSLB License #1072368

![bathroom remodel timeline](https://www.mycalibuilders.com/blog-images/bathroom-remodel-timeline.jpeg)

Bathroom Remodeling project by MY Cali BUILDERS INC

**Short answer.** A typical Los Angeles bathroom remodel runs 3 to 5 months from signed contract to final inspection. Design and permits take 4 to 8 weeks. Active construction takes 4 to 7 weeks. The full week-by-week schedule is below.

## Week-by-week schedule

### Phase 1: Design and selections

**Weeks 1 to 3.** Site measurement. Layout decisions. Tile, vanity, fixture, and lighting selections. End of phase: signed-off drawings and complete material list ready for ordering.

### Phase 2: Permit submission and material ordering

**Weeks 3 to 4.** Submit to LADBS. Order all tile, vanity, fixtures, glass enclosure, and lighting. Long-lead items confirmed with delivery dates.

### Phase 3: Permit and material lead time

**Weeks 4 to 10.** Plan check runs 2 to 6 weeks. Tile and vanity lead times run 3 to 8 weeks. Materials and permits both ready by week 10 in typical projects.

### Phase 4: Demolition

**Week 11.** Existing fixtures, tile, drywall, and flooring removed. Floor and wall conditions inspected. Hidden water damage and prior unpermitted plumbing surface here.

### Phase 5: Plumbing rough

**Weeks 11 to 12.** New supply lines and drain locations roughed in. Shower valve set. Tub or shower base set. Rough plumbing inspection passed.

### Phase 6: Electrical rough

**Week 12.** New circuits run. Vanity lights, fan, and accent lighting roughed in. Rough electrical inspection passed.

### Phase 7: Waterproofing and framing closures

**Weeks 12 to 13.** Shower walls and floor waterproofed with a code-approved system. Framing closures complete. Drywall hung outside the shower.

### Phase 8: Tile installation

**Weeks 13 to 15.** Wall tile, floor tile, niche, and bench tile installed. Grout applied. Sealing where required by material.

### Phase 9: Vanity, plumbing trim, and electrical trim

**Week 15.** Vanity set. Counter installed. Faucet, toilet, shower trim, and tub spout installed. Light fixtures, switches, and outlets installed.

### Phase 10: Shower glass template and install

**Weeks 15 to 17.** Glass shop templates after tile is complete. Fabrication runs 5 to 10 days. Glass installed and silicone cured.

### Phase 11: Punch list and final inspection

**Week 17.** Walkthrough. Punch list resolved. Final inspection with the building department. Project closed.

## Where the schedule slips

- Tile arriving short shipped or damaged. Plan to receive and inspect tile two weeks before install.
- Vanity backorders. Lead times stretched to 8 plus weeks on popular brands. Order in week 1.
- Plan check corrections. Each correction round adds 1 to 3 weeks.
- Hidden water damage from prior leaks. Adds 1 to 2 weeks at the rough phase.

For pricing, read [bathroom remodel cost in Los Angeles](https://www.mycalibuilders.com/blog/bathroom-remodel-cost-los-angeles). For layouts, read [small bathroom remodel ideas](https://www.mycalibuilders.com/blog/small-bathroom-remodel-ideas). For walk-in showers, see [walk-in shower remodels](https://www.mycalibuilders.com/blog/small-bathroom-remodel-with-walk-in-shower). To start, open the [contact page](https://www.mycalibuilders.com/contact-us).

Free onsite estimate

### Ready to start your Full Home Remodeling project?

We come to you, review the scope, and give you a written estimate before any work starts. No pressure. No vague quotes. CA Contractor License #1072368.

[Call us](tel:+13102200903) [Text Us](sms:+13102200903) [Get a free estimate](https://www.mycalibuilders.com/contact-us)

Project gallery

## Real projects from our crew

Recent work from MY Cali Builders across the San Fernando Valley.

[See full gallery](https://www.mycalibuilders.com/gallery)

![Double sink vanity with black fixtures and a large mirror.](https://www.mycalibuilders.com/project-media/bathroom-remodeling/WhatsApp%20Image%202026-05-08%20at%2008.35.33%20(7).jpeg)

Bathroom Remodeling

![Spacious bathroom featuring a large mirror and stylish cabinetry.](https://www.mycalibuilders.com/project-media/bathroom-remodeling/WhatsApp%20Image%202026-05-08%20at%2008.35.34%20(6).jpeg)

Bathroom Remodeling

![Modern bathroom with dark tiles, wooden accents, and double sinks.](https://www.mycalibuilders.com/project-media/bathroom-remodeling/WhatsApp%20Image%202026-05-08%20at%2008.35.34%20(8).jpeg)

Bathroom Remodeling

Related services

### See how we approach this work

- [Full Home Remodeling](https://www.mycalibuilders.com/services/full-home-remodeling)
- [Full Home Remodeling in San Fernando Valley](https://www.mycalibuilders.com/service-areas/san-fernando-valley/full-home-remodeling)
- [Full Home Remodeling in Calabasas](https://www.mycalibuilders.com/service-areas/calabasas/full-home-remodeling)

About the author

Written by the MY Cali BUILDERS INC team. Licensed California general contractor, CSLB #1072368. Based in Woodland Hills and serving the San Fernando Valley. [About our team](https://www.mycalibuilders.com/about-us).

FAQs

## Frequently asked questions

Plan 3 to 5 months from contract to final inspection. Design and permits take 4 to 8 weeks. Construction takes 4 to 7 weeks. The largest variables are tile lead time, vanity lead time, and how quickly selections are finalized.

Tile installation is the longest single phase, typically 7 to 14 days for a full bathroom. Wall tile, floor tile, niche, and bench all require careful sequencing and dry time between steps.

No. The bathroom is fully out of service for 4 to 7 weeks during construction. Plan to use another bathroom or set up a temporary arrangement in a powder room.

LADBS plan check for bathroom remodels typically runs 2 to 6 weeks. Like-for-like fixture replacements in the same location may not require permits. Layout changes always require plan check.

Tile delivery week. Specialty tile from a single supplier often arrives short shipped or damaged. The downstream schedule (waterproofing, install, grout, glass template) all wait for complete tile on site.

Keep reading

## More from the blog

[![bathroom remodel cost los angeles](https://www.mycalibuilders.com/blog-images/bathroom-remodel-cost-los-angeles.jpeg)](https://www.mycalibuilders.com/blog/bathroom-remodel-cost-los-angeles)

Bathroom Remodeling8 min read

### [Small Bathroom Remodel Cost in Los Angeles: Realistic Price Ranges](https://www.mycalibuilders.com/blog/bathroom-remodel-cost-los-angeles)

Real 2026 bathroom remodel cost in Los Angeles for small, mid-size, and primary baths. Line item breakdown for tile, fixtures, vanity, and labor.

May 12, 2026 [Read article](https://www.mycalibuilders.com/blog/bathroom-remodel-cost-los-angeles)

[![small bathroom remodel ideas](https://www.mycalibuilders.com/blog-images/small-bathroom-remodel-ideas.jpeg)](https://www.mycalibuilders.com/blog/small-bathroom-remodel-ideas)

Bathroom Remodeling12 min read

### [Small Bathroom Remodel Ideas: 20 Layouts That Work in California Homes](https://www.mycalibuilders.com/blog/small-bathroom-remodel-ideas)

20 small bathroom remodel ideas, layouts, and finishes that fit California floor plans. Real cost ranges, walk-in shower conversions, and what to skip.

May 12, 2026 [Read article](https://www.mycalibuilders.com/blog/small-bathroom-remodel-ideas)

[![small bathroom remodels with walk in shower](https://www.mycalibuilders.com/blog-images/small-bathroom-remodel-with-walk-in-shower.jpeg)](https://www.mycalibuilders.com/blog/small-bathroom-remodel-with-walk-in-shower)

Bathroom Remodeling7 min read

### [Walk-In Shower Remodels: Small Bathroom Conversions That Work](https://www.mycalibuilders.com/blog/small-bathroom-remodel-with-walk-in-shower)

How to convert a small bathroom to a walk-in shower. Layouts, glass options, curb vs curbless, real cost ranges, and choices that fit tight LA bathrooms.

May 12, 2026 [Read article](https://www.mycalibuilders.com/blog/small-bathroom-remodel-with-walk-in-shower)

[See all articles](https://www.mycalibuilders.com/blog)

Ready to get started?

## Get a free estimate

Free onsite visit. Written estimate. You will see the full scope before you decide. No pressure, no vague quotes.

[Call us](tel:+13102200903) [Text Us](sms:+13102200903) Send us a message

License #1072368. Fully insured. Serving the San Fernando Valley since 2020.